H. King, Jr. Jay H. King, Jr. 88 N. Jackson Ave., San Jose, CA 95116 (650) 722-0348 (C) jayhkingjr@gmail.com Summary:Planning/Scheduling/Estimating/Cost
engineer involved in (EPC scheduling) engineering, procurement, and
construction of pharmaceutical facilities, refineries, power plants, and
transit systems. Software development and testing for aircraft,
military transport equipment, and satellites. Education:B.A.
Professional Studies (Business Administration) Barry University, Miami, FL A.A. Computer Science – System Analysis (Saddleback
Community College) Irvine, CA Certified in Microsoft Access using VBA (UC
Fullerton) Fullerton, CA Visual Basic, Oracle 7.3/Developer 2000 Security Clearance:Secret (Inactive) Credential:Transportation
Worker Identification Credential (TWIC - Active till 2015) Military Schooling:US Navy - Submarine Nuclear Plant Operator - Engine
Room Supervisor Computer Skills:Primavera (P3)(P6 / 6.2v & 8.3v), Pertmaster, Artemis, Prestige,
Microsoft Project 4 to 2013, Project 2003 Server, Project 2010 Stand Alone
and Server, MS Office Suite License: Florida
State Builder’s License (Inactive) EMPLOYMENT
HISTORY
4/15 – PresentBayer Health Services, Berkeley, CA – Master Scheduler for $100 MM Lab facility
construction project - develop and maintain a master P6 schedule which
includes engineering, document development, procurement, construction, start
up, commissioning, performance testing, and final qualification.
Responsible for establishing enterprise code structure, project WBS,
converting/integrating MS project schedules, provide critical path analysis,
look ahead schedules, impact analysis for deliverables – procurement of
equipment and documents, along with custom layouts as needed. Attend
weekly meetings with the construction management firm to discuss construction
progress, current issues, three week look ahead schedule, and project risks
along with mitigation options. Daily walkdowns of the site along with photos
for the construction sharepoint directory. 10/14 - 03/15Chevron, Concord, CA – Project Controller assigned to data center location
projects – responsible for both schedule and cost control using Microsoft
Project 2010 – weekly schedule analysis including critical path analysis ,
baseline variance tracking, resource allocation and leveling. Provide
reporting and tracking of project work efforts across multiple teams with a
strong understanding of project scope and execution methodology. 09/12-09/14Genentech, South San Francisco, CA
– Senior Scheduling Engineer
assigned to project services to provide planning & scheduling services to
a number of business units throughout the organization. Provide
Primavera (P6) and MS Project schedules for product production - small
molecule (GMP), seismic retrofit, air handling units along with chiller
equipment change out, and new building construction. Develop fully
integrated schedules and provide monthly updates/reports for all functions
with project critical path analysis and risk analysis using Primavera’s
Pertmaster. Assisted in building a new P6 database along with scheduling
templates with general work guidelines/instructions for the project services
department. 01/12 - 08//12Gallo Winery, Livingston, CA – Project controls consultant assigned to expedite
tank erection involved with a $150MM winery expansion. Work included
field tank installation, tank jacket hydro testing / recording and visual
weld inspections, schedule maintenance (P6) and weekly reporting for the
installation of thirty-six (36) tanks. Stainless steel tank sizes range from
35K to 105K gallons. Perform shop audits (materials verification) as
needed. 07/11 – 12/11GlassPoint Solar, Inc., Fremont, CA – Project controls consultant assign to GlassPoint
for the Solar Steam Generation Pilot Projects (Enhanced Oil Recovery) in
Oman, Kuwait, and Bakersfield, CA. Instrumental in establishing project
controls methods and procedures, developing, and maintaining the master
project schedule. Produce routine monthly reports for schedule and cost
(earned value) performance by the various sub-contractors. Developed schedule
performance metrics and assisted with development of construction check
lists. 02/11 – 06/11Genentech, Vacaville, CA – Project controls consultant assigned to the
automation project for plant manufacturing processes –
verifying/supporting earned value reporting and project analysis with
cost projections and estimate to complete for key project milestones.
Work scope includes all documentation, H/W, S/W, as well as a pilot
project. Weekly updates include all sub contract work as well as
Genentech staff and consultants – produce various performance curves and
earned value reports for the different elements, project work groups, and
sub-contractor. 12/05 – 01/11Lockheed Martin Space Systems
Company, Sunnyvale, CA - Senior
Cost/ Schedule Analyst - developed and maintained satellite engineering and
manufacturing schedules. Produced a fully integrated master schedule - all
S/W and H/W engineering, mfg. disciplines and sub-contractors. Processed
weekly schedule updates and checked for variances against the baseline
schedule and/or impacts to the critical path. Prepared weekly and
monthly schedule performance reports. Ensured schedule was in
compliance with corporate and government directives/policy, participated in
risk mitigation meetings, and chaired demand management meetings. 10/05 – 11/05Genentech, Vacaville, CA - Maintenance outage project controls engineer
responsible for the outage schedule – development of all outage related
project schedules including all interdependences and constraints. Tasked
with detail review of logic networks with the responsible project managers
and client representatives. Process daily updates of all scheduled
activities performed by each shift and provide work around plans as needed
during the completion of the different projects doing the outage.
Report to the client representatives daily on progress and all issues
impacting the outage schedule.
03/03 – 09/05Caltrain, San Mateo, CA - Project controls engineer for the Capital
Improvement Projects - responsible for all schedules and related project
updating for assigned projects including monthly collection and review of
cost data as well as forecasting. Developed various department template
schedules and desk top procedures for their use. Assisted estimating
department with estimates using RS Means for all disciplines/types of
construction. Produce cash flow schedules and manpower loading
charts. Develop and process budget transfers along with other cost
documentation. 08/01 – 02/03Valley Transit Authority (VTA),
Santa Clara, CA - Project
controls engineer for Capital Improvement Projects. Maintained the
master capital program schedule, and ensured that the network was fully
integrated. Provided project reports which included schedule forecasts
and costs (estimate to complete). Developed various department template
schedules and desk top procedures. Produce cash flow curves, reports,
and manpower loading charts. Develop and process budget transfers along
with processing final project closeout documentation. Assisted
estimating department with development of estimates and review/analysis of
estimates. Developed a MS Access database for use in analyzing
contractor unit pricing. Instructed agency employees in the use of
Primavera Project Planner (P3) and MS Project 2002. 02/01 – 07/01United Defense, Santa Clara, CA
- Project controls engineer
assigned to the Bradley Troop Transport A3 project. Responsible for
schedule and cost reporting against project WBS. Project consisted of
software and hardware engineering, procurement, installation, testing,
training, and documentation. Project schedule included all
interdependencies and deliverables – direct and subcontracted work items. 09/00 – 01/01Moss Landing Power Plant, Moss
Landing, CA - Project controls
engineer for the construction of a four-unit power plant (natural gas) with a
capacity of 1060 MW. Responsible for daily invoice processing,
disbursement vouchers, as well as, monthly progress and cost reports.
Develop/maintain an MS Access database, various schedules and report